Pages showing the construction
of the Branch Junction, Page Five.
This page will take a while to download, please be patient.
[ Back
to Home menu ]
[ The Group | TheLayout
| Ingredients
| Stock List | Gallery | Details
| ExhibitionDiary| Links
]
Branch Junction Pages
[ Page
One | Page Two | Page Three
| Page
Four | Page Five | Page Six ]
[ Page
Seven | Page Eight | Page Nine
| Page
Ten | Page Eleven | Page Twelve
]
This first Sunday session gave Gary the
opportunity to get on with the wiring,
unfortunately, apart from a lot of wires there is not much to
show of his work!
Fenton and I were able to get on with
constructing the additional fiddle
yard for the branch. Here Fenton takes a breather while I take a
picture of
our handy work.
The view through the hole in the backscene from the new
fiddle yard.
And a similar view from the other side.
Gary, stooping to operate the old H&M
Duette controller, drives a DMU over the Branch
junction to test both the point work and his wiring.
The DMU progresses over to the branch smoothly and without any
de-railments.
The same train from the other end of the board.
Branch Junction Pages
[ Page
One | Page Two | Page Three
| Page
Four | Page Five | Page Six ]
[ Page
Seven | Page Eight | Page Nine
| Page
Ten | Page Eleven | Page Twelve
]
Top of Page
Thank You for visiting our model railway pages.
[ Back
to Home menu ]
[ The Group | TheLayout
| Ingredients
| Stock List | Gallery | Details
| Links ]
© Copyright Terry Bowden & Westford Modellers Group. 2002 - 2008